The cost object of the plantwide overhead rate method is:
Select one:
a. The unit of product.
b. The production departments of the company.
c. The production activities of the company.
d. Manufacturing cost pools.
e. the time period.
Answer
The cost object of plant wide overhead rate method is unit of
product. This is because each unit can be given cost by this
method.